A planner opens a venue PDF to find one number: capacity in theatre, ceiling height, power on the terrace. They hunt for it and forward the document to whoever signs off. If that number is not on the first two pages, the venue drops off the shortlist before anyone has spoken to you. Venue managers know this and still send twenty-page spec sheets, on the theory that planners want everything in one document.
A spec sheet that closes deals is short, ordered the way a planner reads, and exact on the handful of figures a competitor would rather leave vague: capacity per set-up, room dimensions, power, floor load, access, and the constraints that cost money on the day. Everything else belongs in the quote or the site visit.
What planners check, and in what order
A corporate planner is comparing several venues at once, often between two meetings, and usually on behalf of someone else who will make the final call. Their first question is a simple yes or no, does it fit, so capacity comes first, per room and per set-up, with each set-up named the way the industry names it. The Events Industry Council glossary defines a banquet set-up as a grouping of rounds arranged to ease food service; if your sheet says “banquet 180”, say whether that means rounds of 8 or rounds of 10, because the two do not fit in the same room.
Second comes a dimensioned floor plan rather than a rendering, with meters or feet, clear ceiling height, pillar positions and door widths. Third, access: address, nearest station, loading dock, number of parking bays. Fourth, technical and catering: what is in-house, what is a preferred supplier, what is free choice. Fifth, constraints: noise curfew, set-up and strike windows, exclusivity clauses.
- Capacity per room and per set-up: theatre, classroom, rounds of 8 or 10, cocktail, U-shape, boardroom
- Dimensioned floor plan with clear ceiling height and pillar positions
- Access: transport, loading, parking, lifts
- Technical and catering: in-house, preferred, or free choice
- Constraints: curfews, set-up windows, exclusivities
Price gets checked early too. We are not arguing against a starting rate; it filters out requests that were never in budget. But a planner who cannot confirm that the room fits will never reach the price line.
The exhaustive spec sheet is a way of hiding
The classic mistake is a document that answers every conceivable question so that nobody ever has to call. It reads like an insurance policy. Twenty pages, three fonts, the fire evacuation plan next to the canapé menu.
The real problem is not length: an exhaustive sheet buries the one figure that separates you from the venue next door somewhere in the middle of page eleven, and the planner never gets there. It also dates fast: the more you include, the more is wrong six months later, and an outdated capacity is the quickest way to lose credibility during a site visit, because planners cross-check your numbers against the room in front of them.
Keep the sheet to what a planner needs to shortlist you. Put the rest in a technical annex you send on request, or in the quote itself.
A structure that fits on a few pages
In practice, the sheets that work run two to four pages, simply because that is how much room the questions above take up. One order we see working:
- Identity and access: one photo of the main room set for an event, the address, transport, parking, loading.
- Rooms and capacities: one table, one line per room, one column per set-up, plus surface, ceiling height and daylight.
- Technical, catering and services: what is included, what is extra, what is exclusive.
- Constraints and contact: curfews, windows, insurance requirements, and the name and direct line of the person who answers.
The table is the heart of the document. Here is a minimal version with illustrative figures.
| Room | Surface | Clear height | Theatre | Classroom | Rounds of 10 | Cocktail |
|---|---|---|---|---|---|---|
| Main hall | 320 m² | 5.2 m | 300 | 160 | 200 | 350 |
| Gallery | 140 m² | 3.4 m | 120 | 60 | 80 | 150 |
| Boardroom | 45 m² | 2.9 m | 30 | 18 | n/a | 40 |
Put the version number and date in the footer. When a planner forwards a spec sheet internally, that version number is how you find out, three weeks later, which figures they actually saw.
The details that separate you from the venue next door
Most spec sheets stop at capacity and photos. The planners with a real production on their hands, a car launch, a gala dinner, a hybrid conference, are stuck on five specific figures that almost nobody publishes, so publish them.
- Floor load: kilograms per square metre (or pounds per square foot) for each room, and the route a forklift or pallet truck can take. A stage set or a vehicle needs this before anything else.
- Ceiling height and rigging: clear height under the lowest beam, not at the highest point, whether rigging is allowed, at what load per point, and who certifies it.
- Electrical power: available amperage, connector types, distance from the room to the supply, and whether a generator can be brought in.
- Accessibility: step-free route from the street and from parking to every room you sell, accessible toilets, and where accessible seating sits in a theatre set-up.
- Noise curfew: the time amplified sound must stop, indoors and outdoors, and whether that comes from your licence or from your lease.
Give each of these a number, a unit, and a date of measurement. A range is fine, but do not leave a blank.
Capacity, accessibility and noise: the legal ceilings behind the numbers
On accessibility, state facts rather than a pictogram. In the US, hotels, restaurants, theatres and similar businesses are public accommodations under the ADA, which requires removing architectural barriers in existing buildings where readily achievable and building new or altered facilities to the 2010 ADA Standards for Accessible Design. In the UK, section 20 of the Equality Act 2010 sets a duty to make reasonable adjustments where a physical feature puts a disabled person at a substantial disadvantage. Neither text belongs on your spec sheet, but their consequences do: the ramp, the elevator, the toilet, the parking bay.
Capacity has a legal ceiling too. The occupant load your fire authority set under NFPA 101, the Life Safety Code, or under the means-of-egress chapter of the International Building Code, is a limit your marketing capacity cannot exceed. If the two figures differ, say which is which. Planners who have been through a fire inspection will ask.
Noise deserves the same candour. In England and Wales, the Licensing Act 2003 lists the prevention of public nuisance among its licensing objectives, so your premises licence carries hours and conditions for regulated entertainment. Write those hours on the sheet. A planner who discovers at the tasting that the band stops at 23:00 will not blame the licence.
Where the sheet stops and the quote starts
The spec sheet is there to get you shortlisted; it is neither the quote nor the contract. Once the planner comes back with a date and a headcount, the numbers move into the quote, where you control validity, options and conditions; at the venues that use Joinways the quote is prepared from the request itself, so the capacity table and the quote never contradict each other.
Then keep it alive. Review the whole sheet once a year and correct it the day anything changes: a new rigging inspection, a change in licence hours, a room repainted. Those facts already live in the event record for every booking; the spec sheet should draw from the same source rather than from someone’s memory.
Frequently asked questions
- What should a venue spec sheet include?
- Capacity per room and per set-up, a dimensioned floor plan with clear ceiling height, access and parking, what is in-house versus preferred supplier for technical and catering, the constraints (curfews, set-up windows, exclusivities), a starting rate or range, and a named contact with a direct line. Add floor load, power and accessibility facts, and date the document.
- How long should a venue spec sheet be?
- Long enough to answer the shortlisting questions and no longer. In practice that is two to four pages. Anything a planner only needs after they have chosen you, insurance wording, full menus, house rules, goes into a technical annex sent on request or into the quote, where the conditions are dated and signed.
- Is the capacity on my spec sheet the same as the legal occupant load?
- Not necessarily. The occupant load is set by your fire authority under the applicable life safety or building code and depends on egress, not on how many chairs fit. Your marketing capacity per set-up must stay under it. If the two numbers differ, publish both and say which is the legal ceiling.





